Bihar Logistics Policy, 2023
Bihar's Strategic Proximity & Enabling Logistics Infrastructure
Bihar has a unique location-specific advantage owing to proximity to the vast markets of Eastern, Central and Northern India, Nepal and Southeast Asia. The State can leverage its position next to land-locked Nepal via the BBIN Motor Vehicles Agreement, through the Inland Container Depot at Birgunj, Nepal, less than 10 km from Raxaul in Bihar. Through this policy, the Government envisages attracting investment in warehousing, cold storage, technological solutions, robotics & automation, and skill development.
| Infrastructure Mode | Key Facts & Network Strength |
|---|---|
| Rail network | 3,794 km of rail lines (~5.6% of India's total network); Eastern Dedicated Freight Corridor (EDFC) spans 240 km through the State. |
| Road connectivity | 5,948 km National Highways + 37,134 km State Highways; 751 km of NH being upgraded under Bharatmala; SAARC Corridor links Bihar to neighboring BBIN nations. |
| Air cargo growth | 3 operational airports (Patna, Gaya, Darbhanga); air freight movement rose 6x from 1.04k tons (2004-05) to 6.32k tons (2018-19). |
| Inland Waterways | 7 rivers declared National Inland Waterways under NW Act 2016; NW-1 (Allahabad-Haldia) operational with fixed jetty at Patna & floating terminals. |
Structural measures and infrastructure status
- •Infrastructure Status: MMLPs and Logistics Parks (comprising ICD, cold chain, warehousing) are granted infrastructure-lending status, enabling easier borrowing terms and access to ECBs.
- •High Priority Status: All eligible Logistics Units, Logistics Parks, and MMLPs receive High Priority Status for clearances.
- •Dedicated Logistics Division: Headed by an officer not below Director rank under the Department of Industries to coordinate inter-departmental clearances.
- •Green Channel for EXIM Cargo: Reduced-inspection channels to prevent transit delays, plus comprehensive transport zones near highways with lay-byes, workshops, and rest-houses.
- •Logistics Zones: Dedicated Logistics Zones (DLZ) declared along the EDFC periphery with 24x7 water-power and link-infrastructure support.
- •Deemed Land-Use Conversion: Automatic land-use conversion within 30 days from date of application.
Minimum criteria for MMLPs, Logistics Parks, and Logistics Units
| Facility Type | Minimum Land Area | Minimum Investment | Other Technical Requirements |
|---|---|---|---|
| Multi-Modal Logistics Park (MMLP) | 30 acres | ₹60 Crore | Mechanised warehouses, specialized storage (cold chain), rail-siding access (within 3 yrs), and min 2-lane approach road (min 60 ft). |
| Logistics Park | 25 acres | ₹50 Crore | Includes CFS, ICD, warehouses, and/or cold chains with related infrastructure. |
| Container Freight Station (CFS) | 5 acres | ₹10 Crore | Must comply with CBIC Circular No. 50/2020 infrastructure/regulatory norms. |
| Inland Container Depot (ICD) | 17 acres | ₹20 Crore | Rail linkage, 15m-wide access roads, weighbridges (60 MT), container tracking system (CBIC 50/2020). |
| Warehousing Facility | 1 Lakh sq. ft. | ₹30 Crore | Min 5,000 MT storage; Grade A norms, WMS, 8-hr power backup, loading/unloading bay, CCTV (1-month backup). |
| Cold Chain | 20,000 sq. ft. | ₹20 Crore | Min 1,000 MT storage; multi-chamber, temperature/humidity monitoring, 12-hr power backup, CCTV (1-month backup). |
Subsidies, tax-reimbursements, and concessions layered on top of BIIPP 2016
Logistics Parks & Multi-Modal Logistics Parks (MMLPs)
| Incentive Type | Logistics Park (FCI / Cap) | MMLP (FCI / Cap) | Source / Governing Policy |
|---|---|---|---|
| Capital Investment Subsidy (First 2 Yrs) | 20% of FCI (max ₹20 Cr) | 20% of FCI (max ₹25 Cr) | Bihar Logistics Policy, 2023 |
| Capital Investment Subsidy (3rd Yr on) | 15% of FCI (max ₹10 Cr) | 15% of FCI (max ₹15 Cr) | Bihar Logistics Policy, 2023 |
| Interest Subvention (First 2 Yrs) | 10% or actual rate (lower), cap ₹60 Cr | 10% or actual rate (lower), cap ₹60 Cr | Bihar Logistics Policy, 2023 |
| Interest Subvention (3rd Yr on) | 10% or actual rate (lower), cap ₹50 Cr | 10% or actual rate (lower), cap ₹50 Cr | Bihar Logistics Policy, 2023 |
| Tax-related Incentives | 100% SGST & Electricity Duty reimbursement for 5 years | 100% SGST & Electricity Duty reimbursement for 5 years | BIIPP, 2016 |
| Stamp Duty & Land Conversion Exemption | 100% exemption on lease/sale/transfer of industrial land and land conversion | 100% exemption on lease/sale/transfer of industrial land and land conversion | BIIPP, 2016 |
Logistics Units (ICD, Warehouse, Cold Chain, CFS)
| Logistics Unit Type | First 2 Years (CIS % / Cap) | 3rd Year Onwards (CIS % / Cap) | Interest Subvention Cap (First 2 / 3rd Yr) |
|---|---|---|---|
| Inland Container Depot (ICD) | 20% / ₹10 Cr | 15% / ₹8 Cr | ₹30 Cr / ₹20 Cr |
| Warehousing Facility | 20% / ₹6 Cr | 15% / ₹4 Cr | ₹30 Cr / ₹20 Cr |
| Cold Chain | 20% / ₹4 Cr | 15% / ₹3 Cr | ₹30 Cr / ₹20 Cr |
| Container Freight Station (CFS) | 20% / ₹3 Cr | 15% / ₹2 Cr | ₹30 Cr / ₹20 Cr |
Special Class Entrepreneurs top-up
For SC, ST, EBC, EWS, Women, Differently-abled, War-widows, Acid attack victims, and Third gender entrepreneurs: Interest subvention rate is increased by 15% (i.e. 11.5% or actual rate, whichever is lower) and the maximum subvention cap is increased by 15% (i.e. up to 57.5% of FCI or ₹23 Cr for Logistics Units).
Installation-linked milestone payments and ownership rules
- •Logistics Park/MMLP CIS Schedule: 1st instalment (50%) after 12 months on min 12 acres or 50% park area. 2nd instalment (30%) after 24 months on cumulative 20 acres or 80% area. 3rd instalment (20%) after 36 months on 100% area.
- •Logistics Units CIS Schedule: 1st instalment (50%) after 12 months or 50% completion. 2nd instalment (30%) after 24 months or 80% completion. 3rd instalment (20%) after 36 months or 100% completion.
- •Shareholding Lock-in: More than 50% of shareholding value of a Logistics Park/MMLP cannot be transferred until 5 years from the last incentive payment.
- •Maximum Capping: The maximum total incentive value under this policy is ₹150 Crore per eligible entity.
- •Development Reserve Fund (DRF): Promoters must contribute 5% of land-allotment collections and 10% of Annual Net Profit into a fixed deposit DRF for maintenance.
- •Clawback / Recovery: False declarations or diversion of use triggers recovery of all incentives with 18% per annum compounded interest.
Stage-1 Clearance, Land Allotment, and Financial Approval
- 1Eligible units submit fully-filled online applications for Stage-1 clearance on the Single Window Clearance portal (swc2.bihar.gov.in); processed within 7 working days.
- 2Apply for land allotment on the BIADA portal (biadabihar.in); disposed of by BIADA within 30 working days.
- 3Apply for Financial Clearance on the Single Window Clearance portal (swc2.bihar.gov.in) of the Department of Industries.
| Milestone / Process Event | Stipulated Timeline |
|---|---|
| Stage-1 Clearance (SWC Portal) | 7 working days |
| Land Allotment (BIADA Portal) | 30 working days |
| Logistics Park Establishment Period | 30 months (extendable by 6 months on merit) |
| MMLP Establishment Period | 42 months (extendable by 6 months on merit) |
| Policy Validity Term | 5 years from date of notification (till December 2028) |