Haryana Data Centre Policy 2026
Haryana Data Centre Policy 2026 at a Glance
The Haryana Data Centre Policy 2026, notified by the Department of Industries & Commerce vide Notification No. 20/12/2026-4IB-1 on 27 May 2026, is a 5-year flagship framework designed to position Haryana as a globally competitive hub for digital infrastructure and cloud processing.
With India's data centre capacity expanding toward 2,100 MW by FY2027, Haryana leverages its strategic location in the National Capital Region (Gurugram and Faridabad), reliable dual-grid power infrastructure, extensive optical fibre networks, and proximity to international airports to target ₹10,000 Crore in cumulative investments.
Core Policy Objectives — Clause 4
- •Attract ₹10,000 Crore of cumulative investment in the data centre ecosystem during the policy period.
- •Provide transparent, time-bound Single Roof clearances via the Haryana Enterprise Promotion Board (HEPB).
- •Promote green data centres through adoption of renewable energy and water-efficient cooling systems.
- •Drive allied tech growth in AI, fintech, cloud services, and digital public infrastructure.
- •Generate high-quality direct and indirect employment across engineering, IT, construction, and facility management.
Categorization and Minimum Eligibility Gates
To qualify under this policy, Data Centres and Data Centre Parks must be established within Haryana and meet contracted power capacity thresholds dedicated to data centre operations:
Table 1 — Data Centre Category Classification (Clause 2.1)
| Category | Contracted Power Capacity | Policy Eligibility Gate |
|---|---|---|
| Hyperscale Data Centre | Exceeding 10 MW | Eligible under Policy Clause 9.1 |
| Core Data Centre | More than 1 MW and up to 10 MW | Eligible under Policy Clause 9.1 |
| Edge Data Centre | 300 kW up to 1 MW | Covered under Haryana MSME Policy 2026 |
| Data Centre Park | Minimum 20 MW cumulative power | Eligible under Policy Clause 10.1 |
Key Operational Definitions (Clauses 2.4 - 2.15)
| Term | Definition & Thresholds |
|---|---|
| Fixed Capital Investment (FCI) | New investment in land, building, IT/Non-IT equipment, power backup, and captive RE plants made before COD and within 1 yr (MSME/Large) or 3 yrs (Mega/Ultra-Mega). |
| New Enterprise / Unit | Unit commencing operations during the policy period. Expansions at different locations are treated as New Units. |
| Expansion / Diversification | Existing unit undertaking at least 50% additional FCI, OR 25% additional FCI with min ₹125 Cr, OR exceeding Mega/Ultra Mega location thresholds. |
| Local Employee | Bona fide resident of Haryana verified exclusively via Parivar Pehchan Patra (PPP). |
| Net SGST | SGST paid through cash ledger after first exhausting all available Input Tax Credit (ITC), including IGST ITC. |
| Data Centre Park Developer | Entity developing an integrated cluster of 2+ DC units over planned infrastructure (roads, power, connectivity, water, drainage) per TCP norms. |
CAPEX, OPEX & Employment Subsidies for Data Centre Units
A. Capital Expenditure (CAPEX) Support — Clause 9.1(A)
Reimbursement of eligible capital expenditure (ECE) disbursed in 10 equal annual instalments starting after commencement of commercial operations or achievement of committed investment:
| DC Unit Category | CAPEX Reimbursement Percentage | Maximum Incentive Ceiling |
|---|---|---|
| Hyperscale Data Centre (>10 MW) | 20% of Eligible Capital Expenditure (ECE) | ₹25 Crore per unit |
| Core Data Centre (1 MW – 10 MW) | 10% of Eligible Capital Expenditure (ECE) | ₹1 Crore per MW |
| Edge Data Centre (300 kW – 1 MW) | Provided under Haryana MSME & Exports Policy | As per MSME Policy 2026 |
B. Operational Expenditure (OPEX) Support — Clause 9.1(B)
Reimbursement of eligible operational costs for a period of 5 years from date of commencement of commercial operations:
| DC Unit Category | OPEX Reimbursement Percentage | Annual Incentive Ceiling |
|---|---|---|
| Hyperscale Data Centre (>10 MW) | 50% of eligible operational expenditure | ₹8 Crore per annum |
| Core Data Centre (1 MW – 10 MW) | 30% of eligible operational expenditure | ₹4 Crore per annum |
Eligible OPEX heads include: Net SGST paid to GoH, wheeling and transmission charges paid for power import, electricity duty paid to GoH, and expenses incurred for global data centre certifications.
C. Local Employment Generation Subsidy — Clause 9.1(C)
Granted for 10 years from COD to reward high-quality local hiring verified via Parivar Pehchan Patra (PPP):
| Haryana Local Workforce Proportion | General Category Subsidy Rate | Women / SC / Divyang / Agniveer / Ex-Servicemen Subsidy Rate |
|---|---|---|
| < 15% Local Employees | Not Applicable | Not Applicable |
| ≥ 15% Local Employees | 100% + {20% * (% Local - 15%)} of gross monthly salary (Cap: ₹1 Lakh/yr/emp) | 120% + {20% * (% Local - 15%)} of gross monthly salary (Cap: ₹1.2 Lakh/yr/emp) |
D. HKRN Employment Booster (EPF Support)
- •Employer EPF Reimbursement: 100% reimbursement on employer's statutory EPF contribution for 5 years for hires made through Haryana Kaushal Rozgar Nigam (HKRN), capped at 12% of basic+DA or ₹25,000/yr/employee.
- •Employee EPF Reimbursement: 100% employee EPF contribution reimbursed directly to HKRN-recruited workers via Direct Benefit Transfer (DBT) for 5 years (capped at ₹25,000/yr/employee).
- •HEPB Customized Packages: Ultra Mega and Mega Projects are eligible for customized incentive packages approved by the Haryana Enterprise Promotion Board (HEPB) over and above standard policy heads.
Support Offered to Data Centre Park Developers
A. Park CAPEX Support — Clause 10.1(A)
Data Centre Park Developers (minimum 20 MW cumulative contracted power) receive 20% CAPEX reimbursement on park infrastructure, subject to a ceiling of ₹15 Crore, disbursed in 4 tranches:
| Instalment Tranche | Disbursement Percentage | Eligibility Milestone Criteria |
|---|---|---|
| 1st Instalment | 50% of Eligible Incentive | Grant of license & completion of basic amenities by TCP Department |
| 2nd Instalment | 20% of Eligible Incentive | Proof of operation of at least 25% of total permissible unit area |
| 3rd Instalment | 15% of Eligible Incentive | Proof of operation of at least 50% of total permissible unit area |
| 4th Instalment | 15% of Eligible Incentive | Proof of operation of at least 75% of total permissible unit area |
B. Park Interest Rate Subsidy
Developers are entitled to an Interest Rate Subsidy @ 5% on term loans for 5 years, subject to an annual ceiling of ₹5 Crore per annum.
Infrastructure, Power, RoW, and Regulatory Facilitation
Key Non-Fiscal Provisions (Clause 11)
| Category | Regulatory & Infrastructure Relief Provided |
|---|---|
| Haryana Building Code | Section 6.3(3)(iv) provides relaxed FAR of 500%, ground coverage up to 60%, and unrestricted building height. |
| Infrastructure Status | Data Centres declared as an Infrastructure Industry vide Notification dated 22 Nov 2023. |
| Power Supply | Continuous dual-grid power networks provided; Data Centres declared as Energy Intensive Industry. |
| Water Supply | 24x7 dedicated industrial water supply provided for high-density cooling towers. |
| Connectivity & RoW | Redundant last-mile fibre, Single Roof online Right of Way (RoW) clearance, Dial Before You Dig Policy. |
| Public Procurement Preference | HARTRON empanelment; GoH departments to give 1st preference to empaneled DCs in Haryana. |
| HSIIDC Land Reservation | HSIIDC to reserve dedicated plots in IMTs and Industrial Estates for Data Centre units. |
| Single Roof Clearances | Pre-commencement approvals within 10 working days; Commencement approvals within 15 working days. |
| Essential Services | Declared Essential Service under Haryana Essential Services Maintenance Act (ESMA) 1974. |
| Property Tax | Property tax levied at par with standard industrial rates. |
Requirements for Submitting Subsidy Claims
Mandatory Document Checklist for Claim Filings
| S. No. | Document Required | Target Head / Requirement |
|---|---|---|
| 1 | Single Roof Portal Application Form | Submitted prior to commercial operations date (COD) |
| 2 | Proof of Contracted Power Capacity (≥1 MW DC Unit / ≥20 MW Park) | Contracted demand letter from UHVBN / DHVBN power utility |
| 3 | Fixed Capital Investment (FCI) & ECE Audit Schedule | Certified by Chartered Accountant with invoice & payment ledgers |
| 4 | Parivar Pehchan Patra (PPP) Verification Records | Mandatory proof for claiming Local Employment Generation Subsidy |
| 5 | Net SGST Payment Cash Ledger Receipts | Required for annual OPEX reimbursement claim |
| 6 | Wheeling / Transmission / Electricity Duty Payment Proofs | Supporting documents for OPEX power cost reimbursement |
| 7 | Green Building & Global DC Certifications (LEED / IGBC / BEE) | For claiming certification CAPEX/OPEX reimbursements |
| 8 | Town & Country Planning (TCP) License & Building Plan Approvals | For claiming FAR relief and Data Centre Park CAPEX tranches |
Step-by-Step Application Workflow
- 1Project Categorization: Determine contracted power capacity (Hyperscale >10 MW, Core 1–10 MW, Park ≥20 MW).
- 2File Pre-Commencement Application: Apply via HEPB Single Roof Clearance portal prior to starting commercial operations.
- 3Obtain Statutory Licenses: Secure TCP building plan approval (FAR 500%), fire NOC, dual grid power connection within 10–15 working days.
- 4Maintain Separate Books of Accounts: Expansions must obtain separate GST registration or maintain clear project ledgers.
- 5Verify Haryana Workforce: Onboard local employees via Parivar Pehchan Patra (PPP) portal.
- 6File CAPEX/OPEX Claim: Submit CA-certified FCI and ECE statements after COD to receive 10-year CAPEX instalments and 5-year OPEX support.
Government Notifications, Statutory Citations & Legal References
The Haryana Data Centre Policy 2026 is published under the official authority of the Governor of Haryana and backed by statutory notifications and inter-departmental concurrences:
| Reference / Citation Head | Official Gazette & Government Record Details |
|---|---|
| Primary Policy Notification | No. 20/12/2026-4IB-1 dated 27th May, 2026; Department of Industries & Commerce, Government of Haryana. |
| Official Gazette Publication | Haryana Govt. Gazette (Extraordinary), No. 81-2026/Ext., Chandigarh, Wednesday, May 27, 2026 (Jyaistha 6, 1948 Saka). |
| Finance Department Concurrence | U.O. No. 1/27/2026-3FD-III//2026/7008 dated 02.04.2026. |
| Cabinet Approval | Approved by the Council of Ministers in its meeting held on 18th May, 2026. |
| Notification Signatory | Amit Kumar Agrawal, Commissioner & Secretary to Government Haryana, Industries & Commerce Department. |
| Infrastructure Industry Status | Notification No. 02/13/2023-41B-II dated 22nd November 2023. |
| Essential Services Maintenance (ESMA) | Notification No. 47/1/2017-5 dated 12.07.2023 (declared under Haryana Essential Services Maintenance Act, 1974). |
| Transport Hub Permissibility | Department of Town & Country Planning Policy dated 19.03.2021 & amendment dated 14.12.2021. |
| Haryana Building Code Provisions | Section 6.3(3)(iv) of the Haryana Building Code (500% FAR, 60% ground coverage, unrestricted height). |
| Local Employment Verification | Parivar Pehchan Patra (PPP) system, Government of Haryana. |
| State Connectivity & RoW Guidelines | State Communication & Connectivity Infrastructure Policy, 2017. |
| Competent Interpretative Authority | Administrative Secretary, Department of Industries & Commerce, Haryana (Clause 8). |